Scope of 2019-2020







  • Water depth: increase the maximum allowed ships draft from current 15m to 16.5m on October 2018. the project will be conducted on 3 phases.

  • Navis N4: adopted Navis N4 version 3.3.21 which is the latest in the middle east.


  • Equipments
    • 3 STS before the end of quay project.
    • 3 RTGs before the end of the project.



  • Reefers: Increase the terminal capacity from 1850 plugs to 2650 plugs Q2 2020.